The six major points of the paint entry acceptance need to pay attention

Paint acceptance before painting is a crucial part of the renovation process. This must be vigilant for the owner. When checking, it must check the packaging and production date, whether there is a registered trademark on the packaging bag, and quality. Test reports, and when the acceptance, we must prevent construction workers to buy genuine use, material out of the situation occurred, then paint acceptance, should pay attention to what?

First, pay attention to environmental protection

Paint safety indicators should meet the requirements of their respective product standards. Paint products that meet the technical requirements of national environmental labeling products. In recent years, due to the mixed quality of the building materials market, some of the benzene, xylene and other harmful substances in the paint have exceeded the standards and pose a threat to people's health. Complaints about the quality of the renovation building materials are also commonplace. Locations have started to be solvent-based since the previous years. The coating has implemented mandatory 3C certification, stipulating that paints that have not been certified do not allow production and sales, and have conducted supervision and investigation of the market. Therefore, when accepting paint, the owner must check the quality inspection report.

Second, look at the packaging and production date

When consumers purchase paint, they should carefully inspect the packaging to see if there is any leakage phenomenon. Because the paint has a large volatility, it requires the product packaging must be sealed well, if there are signs of metal packaging corrosion, Explain that the sealing performance is not good or the product is stored for a long time, so be careful when buying it. In addition, looking at the packaging also depends on the production date and shelf life. At present, most of the residents in our city decorate the polyester paint, the corresponding warranty period is mostly one and a half years or two years, some polyester paint only There is no shelf life for the production date, so consumers should ask for the expiration date when checking the factory date to prevent them from expiring.

Third, weighing

The net content indicated on the paint packaging produced by the regular paint manufacturer refers to the removal of the pure paint weight of the packaged object. For example, if the package drum weighs 5 kg and the net content of the package is 20 kg, the total weight should be 25 kg after the paint is weighed. Therefore, the owner must use a balance when checking and accepting to avoid that the weight does not meet the requirements.

Fourth, check the specifications

The owner must carry out the necessary inspections for each paint material contract stipulated in the contract. Remember to check the colors of the product against the original color card to prevent mistakes. Others include material specifications and material quantities.

Fifth, quality inspection

When the owner accepts the inspection, it is best to open the reconciliation inspection. The quality of the reconciliation coating is good. The surface is slightly covered with a layer of oil or diluted. The following is thicker. After mixing, it can be fully and evenly colored. The pink color is normal, and if thickened or thickened, it will precipitate. Agglomerators, indicating that the coating has a problem, indicate that the quality of the coating is not relevant.

Sixth, smell detection

The odor detection is to identify the authenticity from the senses and feel, the real latex paint should be no pungent odor, but the poor quality paint taste is not to say, the painted wall will wipe off after a few times, the bottom out . Therefore, before the actual painting, you can test it locally.

Finally, if the inspection result material is qualified, the inspector should sign the paint material acceptance form. This is a more complete process. This is because if the material was checked at the time of material arrival, the necessary procedures were not performed at the time. Afterwards, they repented, and they refused to accept the result of their acceptance. However, since the other party has no evidence in hand, there is no way to do so.

Paint Paint Engineering Paint Buy Paint Stage