Why is the closet door glass broken easily?

How to Lay Kitchen Tiles?
First, before paving:

1. The specifications of kitchen and floor tiles should not be too large, and the overall specifications are too large to be in harmony, and at the same time it is inconvenient to install floor drains on the ground. General kitchen tiles are mostly 300*300 or 330*330.

2. Make bricks before paving, try not to appear less than a third of the narrow columns. It must be processed and cut, and it is advisable that after the tile is cut, it should be greater than two-thirds.

3. Before paving, confirm the tiles used in the kitchen walls and everywhere in order to prevent confusion between the kitchen tiles and tiles, so as to avoid the occurrence of kitchen tile tiles to the bathroom.

4. The bathroom re-tiling the front wall of the tile needs to be treated with waterproof. If you take the method of sticking the tile after putting the wall tile first, you need to do a closed water test before laying the tile. The best ground is for waterproofing again;

5. Before paving, remember to keep track of the line of the wall surface water lines. It is best to keep the circuit and water route maps so that they can be easily searched during maintenance.

6. Kitchen tile If you choose waistline and tiles, consider the position of the tile waist line. The waist line is good on the cabinet of the cabinet. The location of the tile paste should consider the cabinet pendant and the position of the hood. Do not install these objects. Obstructed. Affect the overall coordination and aesthetics.

Second, when paving:

7. The cement used for cementing kitchen tiles is No. 425 cement. The mixing ratio of cement sand should not be greater than 1:3. If the cement content is too heavy, the cracking of the tiles will be caused by the high expansion coefficient of the cement and the service life of the tiles will be reduced. .

8. Kitchen and bathroom glazed wall tiles If cement mortar is used as the adhesive, the tiles need to be soaked in water, and the time for soaking the water is preferably not to take a bubble after the tiles are completely soaked. It is usually 30 minutes. That's it.

9. Paving kitchen tiles whether it belongs to a seamless brick, must be left seam, it is recommended not less than 1mm, ordinary wall tiles to 1.5-2mm, antique brick gap can be appropriately widened.

10. The height of the kitchen tile is higher than that of the ceiling, generally not less than 10 cm.

11. Pay attention to the texture of the tile when paving the tile, do it along the texture paving, the direction of the tile waistline has the positive and negative directions should pay attention to its direction, do not paste down, at the same time the texture of the tile waistline and brick texture consistent.

Third, after paving:

12. Stitching needs to be performed after the tiles are dried. It is usually carried out after 24 hours.

13. After the floor tiles are tiled, they must wait for the floor to dry before they can walk around the tiles or perform other kitchen and bathroom renovation projects.

14. After the tile is laid, it is necessary to check it. If it is found that there is a hollow area, it is better to repair and relocate the place where there is a problem.

15. Drilling the wall needs attention. It is best to spray the water at the hole where the hole is punched for cooling to prevent the tiles from bursting due to the sudden change of the temperature difference in a short time.

16. When drilling a hole in the wall, be sure to check if there is any empty drum, and check the pipeline diagram of the hydropower reform that has been saved. Do not hit the pipeline.

Tiles Floor tiles Cement Kitchen doors Kitchen cabinets Kitchen cabinets Antique bricks Kitchen wall tiles Bathroom tiles Bathroom wall tiles Bathroom ceilings Monolithic toilets Waterproof bathroom floor tiles Kitchen tiles Tiles

Basin Faucet

ZheJiang Haotianchi Sanitaryware Co Ltd , http://www.htc-faucet.com