Do not use "home-made" home improvement acceptance steps

Many owners do not trust the construction side, so they often stare at the decoration from the beginning of the renovation when they are renovated. Not only is the time wasted but it may not be able to play a good role. In fact, if you are a layman in the decoration, even if you are soaked in the construction site, you will not see any problems. For owners who do not have time, “staring at the site” is even more unrealistic. Therefore, if the owner can grasp the progress during the renovation process and carry out inspections in stages, it can avoid frequent visits to new houses and control. The quality of construction. Through the following steps, you can let the owner start the renovation with confidence and do not need to run every day on the construction site.

1, before entering the market

Whether the demolished and reformed project meets the requirements of the contract, whether there is a hidden safety hazard, whether the wall surface treatment is clean, and whether the quantity, grade, and specifications of the incoming material are in agreement with the prior agreement.

2, water circuit

The acceptance of the second stage should be a single acceptance of the waterway and circuit transformation. The industry is mainly to check whether all the transformation lines are unobstructed, whether the layout is reasonable, whether the operation is standardized and the actual size of the line reconstruction is reconfirmed under the operation of a professional plumber. According to the design plan of hydropower reform, we can see if it is reasonable. If it is unreasonable, we should contact the construction personnel to improve it immediately. Only after the line is changed, the putty worker can continue to seal the wall and putty.

3, the size of carpentry work

The third acceptance must be done after the carpentry foundation. At this time, ceilings and plaster lines in the room should also be completed. Wall tiles in the kitchen and bathroom are already attached. At the same time, the painted wall should be scraped. All over putty. Acceptance at this stage is very important. Owners should carefully check the drawings and confirm the dimensions of each part. If any discrepancy is found, promptly remind the construction team to amend it.

4, woodworking work quality

When all the fine wood products are finished with a veneer, and the wooden thread is nailed, the students can carry out the fourth stage of acceptance. This time is based on more than half of the time, this stage of inspection should be focused on wood products. The color difference and texture as well as the large area of ​​flatness and gap are uniform.

After the completion of the wood products, the oil workers can start the processing of the primer, and all the floor tiles should also be posted in this stage. This is the fifth stage in the phased acceptance.

5. Acceptance after completion.

The final phase of acceptance is the most thorough. Students should check the installation of footboards, sanitary ware and hardware, whether the top coat of wood products is in place, whether the paint on the wall and top is uniform, whether the panel is installed by an electrician and whether the position of the lamps is appropriate, and whether the wiring connection is correct. In addition, the owners should require the construction team to clean the room thoroughly before it can be removed.

This series of inspections removes the trouble of “staring at the site” and allows owners to save time and worry!