Gas wall boiler installation precautions

1 Before the boiler is installed, it is necessary to reserve a good space and the position of the flue, and the body of the hanging wall-hung boiler should be positive.

2 Do not use hard pipe links on the bottom of the wall-hung boiler.

3 Install the boiler temperature control switch panel according to the instructions, and the temperature switch panel should be installed in the heating function area to be controlled.