1 Before the boiler is installed, it is necessary to reserve a good space and the position of the flue, and the body of the hanging wall-hung boiler should be positive.
2 Do not use hard pipe links on the bottom of the wall-hung boiler.
3 Install the boiler temperature control switch panel according to the instructions, and the temperature switch panel should be installed in the heating function area to be controlled.
Led Downlight Emergency Conversion Kit
Led Lamp Emergency Power Supply,Led Battery Ballast ,Led Battery Backup Driver,Led Driver With Battery Backup
Foshan Nai An Lighting Electric Co.,ltd , https://www.ledpowerpack.com