Summer decoration notice 5 big questions

Many consumers believe that spring and autumn are the golden seasons for decoration and that construction in the summer is prone to problems. In fact, this argument is incorrect. The objective conditions of high summer temperatures and relatively volatile water are conducive to construction. In the summer construction, as long as the problems that should be paid attention in the summer are handled properly, the construction is carried out safely, reasonably, and efficiently, and every work is done according to the normal construction process and construction process, and the project that satisfies you can also be made.

Brand shop: Dulux

First, give the tiles to drink water.

In summer, because the material is drier than normal, the time required for the treatment of the swelled water should be extended for the tiles, tiles and other materials that need to be treated with swelled water, so that they are fully close to saturation. In this way, it will not appear that when the adhesive is bonded to the cement due to the water absorption, the emptying and detachment occur.

Second, control the condensation time.

When processing materials like gypsum, the setting time should be strictly controlled. Because in the high-temperature dry weather, the molding of the gypsum is more difficult to control, so the setting time should be strictly controlled so that it can reach the standard compressive tensile strength and fineness.

Third, the wall surface treatment should be clear.

When dealing with interior wall paints, due to the hot weather in summer, special attention should be paid to its stability, bonding strength and initial dry crack resistance. The approach taken at this time is to carefully observe the details and make detailed time recordings before making comparisons.

Fourth, pay attention to the size of the thermal expansion and contraction.

In the measurement and installation of plastic doors and windows, sliding doors, pay attention to thermal expansion and contraction in the size arrangement. Because steel is a material that is greatly affected by temperature, if it is too compact in size, it will have gaps and deformations due to lower temperatures in the winter, so there should be a slight surplus in size.

Fifth, pay attention to compact floor pavement.

When paving the floor, the gap should be arranged more closely than before to avoid the gap becoming larger when the temperature decreases and affecting the appearance. Floor and wall joints can be used to form transitions on the floor, this way, not only deal with the wall and floor gap is too large drawbacks, but also played a beautiful role.

Recommended links: fresh and stylish, this website friend 40,000 build 50 flat blue and white Mediterranean beauty

Del floor nature floor cement paint window floor tile floor tile

Other Construction Machinery

Hengxing Industry Machinery Co., Ltd. , http://www.fjconcreteplant.com