In general, winter is not suitable for decoration. In winter, the temperature is too low. Some moisture-containing materials are prone to freezing and difficult to set, especially hardwood, tiles, flooring, paint, glue, etc. It is difficult to achieve the desired effect due to the weather, so that it is difficult for the decoration to achieve satisfactory results. Here we will reveal the corresponding solutions for the three situations that are most likely to occur.
Brand Shop: Runtai Decoration Ou Biya
Problem I: cracking of veneer
Solution: After the decorative panel is transported to the construction site, apply a dry towel to wipe off the floating dust, and apply the brush over the varnish twice. All the decorative panels should be laid flat, with a large core board on the bottom and a large core board on the top, which cannot stand upright. This will prevent the panel from cracking and warping.
Problem two: wall cracking
Solution: Always open the window for ventilation. The best time is between 10am and 4pm. The relatively high temperature during this period of time can prevent the newly approved putty from freezing. After the putty was completely dry the first time, it was approved a second time. After the second putty is completely dry, sand it carefully. Sand gray walls and heat preservation walls are best filled with beanbag cloth or indeed good cloth. They are used to scrape putty directly on beanbag cloth or indeed cloth, and then dry it with sandpaper.
Walls have large holes or depressions. It is best to use gypsum powder and latex to reconcile and flatten the wall to facilitate quick drying and solidification. When there is a large crack in the wall, the local place will be replenished with putty kraft paper. When the area is larger, it is best to paste beanbag cloth and then putty.
Problem 3: Gypsum board ceiling cracks, plaster line cracking
Solution: During the plasterboard ceiling work, gaps of about 1 to 2 cm are left between the plasterboards and between the gypsum board and the wall. The joints are first filled with caulking and then double-clad kraft paper. Putty.
The moisture content of the wooden keel must be controlled below 12%, and the "keel" must be firm and it cannot be loosened, so that cracks in the gypsum board ceiling can be prevented. When the plaster line is plastered, leave gaps of about 0 to 5 centimeters between the gypsum board and the top and wall surfaces. Use gypsum powder and latex to reconcile the gaps to prevent the plaster line from cracking.
Link: Expert Reminder: How to Recognize and Identify Tile Color Difference
Wall Construction Decorative Paint Window Floor Tiles Tile Floor Tiles Ld Tiles
2D Wireless 2.4G Handheld Barcode Scanner
2D Barcode Reader,2D Bar Code Scanner,2.4 G Barcode Scanner,Wireless 2D Barcode Reader
Guangzhou Aigather Intelligent Technology Co., Ltd. , https://www.aigathergz.com