Trap one
Process description is vague
When the decoration company quotations, the owners will pay more attention to the price of individual items, and often ignore the process descriptions, especially what materials, specifications, grades, and formaldehyde, benzene content and other aspects. I was blindfolded at the time, and the quotations given by the decoration company were using vague words, such as cabinets, large core versions of cabinets, and solid wood. The lesson I have learned is that we must verify the material, specifications and grades on the face and verify them on the paper. This will appear as an attachment to the contract to avoid confusion in the future and let the decoration company provide unqualified, non-environmentally friendly materials. .
Trap 2
Area into "water injection" meat
The general owner is concerned about the price of individual items. The actual area is generally a rough estimate. In fact, this piece of land is where the decoration companies do their hands and feet. If each area is slightly increased, then as many as a few hundred or as many as several thousand will go out. . At that time, the area of ​​the paving and brushing walls that I had come up with was very different from that of the decoration company.
Trap three
Two faces before and after the quotation
Under normal circumstances, the decoration company and the owner will modify the quote several times before signing the final contract. Almost speaking, the decoration company will give the owner a final sample and ask the owner to confirm and sign the contract. It must be noted at this time that I can't take it for granted that the signing was the last thing I discussed. I have encountered this kind of thing. The quotation on the first time the decoration company showed it to me indicated that the shoe was made of nine-percent board. When the construction found that the worker used a three-centimeter board, when I asked questions, the worker said: “You are not signing the contract. The three-pronged board?†Looking at the contract, I myself was dumbfounded, and the final quotations that were signed and confirmed were really three PCT boards.
Trap four
Poor quality material "sliding" into play
Although the contract and quotation are clearly written, what material, what specifications, and what level of product should be used, but some decoration companies with a flirtatious mindset always want to “stealâ€. Therefore, when the material enters the arena, it is advisable to present the contract in person and bring the quotation, and ask the knowledgeable person or supervisor to perform the inspection together. When I checked the material, I found out that there was no sign for the big core version and the wire. The tube used for the wire was flat and the putty turned out to be a banned 821 putty. The gypsum board could be broken.
My experience is that I need to appear on the construction site from time to time, to avoid the decoration workers to find out the laws of your time. In addition, the discovery of materials must not be resolute in the changing attitude. At that time, the worker was transported into my house with 821 putty powder, and I insisted on changing. Although the construction team captain verbally agreed, but after a week has not changed, and finally I had to stay on the construction site all day, ordered the captain must change today before they can be replaced. Changed, but I guess he put these putty powders in another owner's home.
Trap five
Workers are more talented and more versatile
The waterworks and electricians of the decoration company are usually the same person. Even the bricklayers are even involved. It is a decathlon. The decoration worker in my home is an all-rounder, with one person working on water and electricity, and only 18 years old. When I asked him to show his employment card, he said that he had forgotten to take it and later he was scared to dare to come to my house. The construction team leader asked other people to find out that he did not have an induction card afterwards. As a result, the line was not connected to the wrong one, which was a tripping short circuit, which made people laugh and cry.
Trap six
Inspire more wood products
To do more woodworking, the construction team can make more money. The owner must decide according to his actual situation, do not be too soft. Unless the apartment type is irregular, the furniture can only be customized by the decoration company, otherwise try to buy it in the furniture factory. My lover took into consideration the fact that the people who make up the company had too little emotion. At the time of their strong request, they let them do it on the spot. The result was a messy quality.
Trap seven
Small parts are always missing
Many parts are counted in the project section, but the construction team will always call it inadequate, and say that if the company needs to make up, it will take the process and will delay the construction period, not as the owner himself. Usually, the owner feels that this is a small sum of money. He neither knows nor has time to let the worker buy it, which gives the worker room to play. Because our family has a car, the construction team captain will call us from time to time, asking us to buy a dozen meters of wire, three or four cassettes, raw silk and three links or something, after the renovation of these "small money" is also about 500 yuan.
Trap eight
"Waste" sells very aggressively
My home is a second-hand decoration and there are quite a few things sold. The most annoying thing is that the 19-square-meter aluminum alloy window of our house was sold to the workers just after it was removed. At that time, we had not yet decided whether or not to change aluminum alloy windows. The construction team leader told the garbage to get rid of the trash, but also took 600 yuan from them.
Trap 9
Early to mid-term
Since I have no experience, I agreed to pay in accordance with the ratio of 5:3:2 when I signed the contract, and paid half of the money when I started. After working for less than 10 days, the construction team leader hurried to ask me to ask for an interim payment. As a result, on the second day after I paid for the money, there was no one on the construction site. From then on, "the world evaporates."
Home Furnishing Trick entrance decoration restaurant decoration window furniture aluminum alloy door price apartment decoration decoration decoration company
Household Appliances Safety Test
Household Appliances Safety Test
Guangdong Yuwei Testing instrument Co., Ltd , https://www.yuweiinstrument.com