Serious acceptance of kitchen bathroom

There are many people who do not carefully check the bathroom and kitchen during acceptance. After a period of time, the bathroom sewer is always blocked and leaking, and the kitchen exhaust pipe is not very smooth. These problems are difficult to repair. So how to check the kitchen bathroom?

Before entering the gate, you need to prepare a “Residential Quality Assurance Certificate,” “House Use Instruction,” and “Completion Acceptance Record Form.” Check whether the housing condition is consistent with the developer’s commitment to the quality of the house and the warranty period and scope.

Check whether the toilet is blocked: fill the floor with water and check for leaks. In housing quality complaints, leakage, ventilation and other issues are relatively large. Therefore, the inspection and acceptance of toilets must be very careful.

Acceptance method for kitchen and bathroom:

Check the ventilation of the bathroom. Check if there is a vent reserved under the ceiling. If it is left on the ceiling, check with a flashlight to see if it has installability. Test the pumping force and check the toilet vent for construction waste with a flashlight. The bathroom is in the corridor. Windows should be equipped with security nets. If there are no windows, ventilation holes should be installed. The vent hole is 10 cm in diameter and is located below the suspended ceiling; the distance from the nearest outlet to the ventilation hole should be.

Kitchen, bathroom acceptance method II:

Check the quality of toilets and baths in the bathroom, including whether there are cracks in the bathroom toilets, baths, bathtubs, toilet bowls, washbasins, etc. If there are leaks, the cracks are sometimes as fine as hairs, and you must observe carefully; Whether it is smooth, whether the sound of flushing is normal, whether the flushing water tank is leaking or not, and whether the tub, the basin and the wall or the interface of the cabinet are waterproof properly.

Kitchen, bathroom acceptance method three:

Whether there is a leak on the bathroom floor. Some people in the bathroom upstairs bath, downstairs toilet may be a small rain, this is because the waterproof upstairs is not done, so when the acceptance of the toilet and upstairs to coordinate, do a good job of the closed water test .

The specific acceptance method is to install sand in plastic bags upstairs and in their own toilets. All the floor drains will be completely plugged and then filled with water for 24 to 48 hours. There will be no leakage in the bathroom downstairs, indicating that there is no problem with the bathroom waterproofing. This waterproof is considered acceptable.

Links: 8 new strategies for acceptance of new homes for renovation

Construction Acceptance House Windows Toilet Toilet Socket Kitchen Door Kitchen Bathroom Ceiling Bathroom Waterproof Toilet Ceiling Bathroom Door Bathroom Leakage

Cutting Machine For Construction

Cutting Machine For Construction,Hand Cutting Machine,Tile Cutter With Cutting Rod,Popular Ceramic Tile Cutter

NINGBO SANDING EDGE MECHATRONICS INDUSTRY AND TRADE CO., LTD , https://www.sandingedge.com