Gucheng Police Tips: How to Identify True and False ID Cards

The second-generation fake ID card has a particularly obvious mark, which can be seen at a glance. This is more intuitive than looking at the "Great Wall" on the Internet and "miniature". Now introduce this method, hoping to help the citizens in their daily lives.

During the production of the second-generation ID card, the Ministry of Public Security specifically created three characters for the second-generation ID card: "resident, citizen, and body" on the reverse side of the ID card. There is a slight difference in the characters in the words. The triangle on the right side of the horizontal pen on the words "ju" and "min" on the real testimony is flush with the vertical pen on the right side of the prefix of "corpse"; Vertical pens are connected. The counterfeit witnesses used ordinary computer typesetting, using the Song typeface in the computer font, and the horizontal strokes on the right side of the "ju" and "civilian" pens in the computer font; the "body" two pens. The right side is connected to the vertical pen. It is because of these three special words that the identification of the second generation of perjury is much easier.

Attached: Pictures

The authentic "ju", "min" and "body"

The "ju", "min" and "body" of the false certificate

Chemical Industry Mass Flow Meter

Sealand is a professional supplier of Chemical Mass Flow Meter, Chemical Mass Flowmeter, Chemical Flowmeter, Chemical Flow Meter, Chemical Coriolis Meter, ATEX, IECEx & CE approved.


The meter can work with a pulse receiver(Count). The connection is as follows. The resistance value is up to the cable length & the max. input pulse frequency of receiver. Current 10mA is suitable for most receivers; however, you can reduce the resistance value when the cable is long. The max. current could be 50mA. Please use the fixed frequency output function to check if the cable length & resistance value is suitable.

Please check following items before operation, and operate according to relevant rules. a) If the meter is damaged during shipment and installation;
b) If the voltage is same as marked on nameplate;
c) If the fuse is correct;

d) If the meter is grounded properly.
e) If the Meter SN on the nameplate of sensor and transmitter are the same.
If everything is fine, please open all valves, make the pipeline full of liquid and then power on the meter for warm-up for 20min before operation. Finally, conduct zero calibration after first start, and shall do it again if the meter is moved to another site.
Preparation for zero calibration:
a) Power on the meter for approximately 20min for warm-up;
b) Run the process fluid through the sensor until the sensor temperature reaches the normal process operating temperature.
c) Close the shutoff valve downstream from the sensor.
d) Ensure that the sensor is filled with fluid and the process flow has completely stopped.


Chemical Mass Flow Meter, Chemical Mass Flowmeter, Chemical Flowmeter, Chemical Flow Meter, Chemical Coriolis Meter

Zhejiang Sealand Technology Co., Ltd. , https://www.sealandflowmeters.com