The mentally grueling stage finally passed. Looking at the floor tiles laid neatly, the house changed its chaotic and dirty appearance some time ago. The owners could not help but opened their mouths. Although it was a further step away from victory, this time it was very much necessary to get out of shape and relax the vigilance. Its solid wood stage is an important stage to test the home improvement company and test the owners. Some of the skill of handling details will emerge at this stage. How to judge whether the construction is scientific and reasonable, and how to do a good job of supervision are all mentioned by Xiaowu.
First, do a good job of moisture protection projects.
Wood is easily deformed by moisture, which almost everyone knows. However, how to do the moisture-proof process of woodwork, most owners have no heart. Yu Tangyin, the manager of a company's engineering department, believes that doing a good job of preventing moisture will have a very important significance in improving the service life and aesthetics of woodworking. Therefore, every owner should take this moisture barrier. First of all, wood products that come into contact with walls and floors should be protected against moisture. In particular, the back of the door and window cover, the back of the wall shape, the back of the foot line, the back of the cabinet on the bedside table of the wardrobe, and the wood products of the bathroom should be protected from moisture very cautiously. If you can, it's best to do more detailed moisture protection on the back of your wardrobe. In addition to applying a layer of moisture-proof paint on the wall, a layer of plastic foam film can also be glued on the back of the cabinet so that the moisture can be kept “outside the doorâ€.
It should be noted that the moisture-proof coating should be applied as far as 1 cm beyond the outer edge of the wood product.
Second, ceiling connection must be handled with care.
Ceilings are almost one of the must-do projects in modern home decoration. However, the cracking of ceilings is a problem that many owners have to face after they have been renovated for several years. Yu Tangyin believes that this is because some construction workers have not scientifically dealt with the connection of suspended ceilings. So soon after the renovation, the wooden parts of the ceilings began to crack. So how do you do construction to avoid cracks in the ceiling? It is understood that the ordinary ceiling connection is like this: two wooden planks are nailed to the wooden keel, and a distance of about one centimeter is left between the panel and the panel to connect with AB glue. If the seam stays large, the unevenness between the board and the board is obvious. It does not look good. If the gap is small, the strength of the bonding is not enough, and the board is easily cracked. In fact, a more reasonable method is to cut the connection planes of the two plates obliquely, put them together in a "V" shape, and inject AB glue in the middle. This way, not only the seams are dense, but also the pulling force is large enough. Then, the seams are sealed with kraft paper so that even if the temperature and humidity change, the ceiling will not crack.
>>>Links: Hidden Projects: Detailed Construction of Ceiling Construction
Third, the balcony should not do too much ceiling.
Some families have large balconies, so they hope to be more sophisticated and make the balcony an independent space. However, insiders suggested that the balcony is less for ceilings. This is mainly due to the large temperature variation of the balcony, the wood is easily affected by the temperature for a while to shrink for a while to expand, long time the joint is easy to crack, it seems to affect the appearance. The cracking of the ceiling is originally a construction problem. Even the best construction must undergo the test of cracking. Therefore, if the ceiling of the balcony is to be decorated, nailing plaster lines will be appropriate.
Ceiling installation paint bed head home decoration home window large wardrobe bathroom ceiling bathroom floor tile bathroom door
The principle of a solenoid water pump is based on the electromagnetic force generated by an energized coil of wire, which is wrapped around a magnetic core. When an electric current is passed through the coil, it creates a magnetic field that attracts a plunger or armature inside the core. As the plunger moves towards the magnetic core, it creates a vacuum that draws water into the pump chamber through an inlet valve. When the plunger reaches the end of its stroke, it blocks the inlet valve and opens the outlet valve, allowing the water to be pushed out of the pump chamber and into the desired location. The solenoid water pump operates on the principle of reciprocating motion, where the plunger moves back and forth to create a pumping action.
Solenoid water pumps can also be classified by their power source. Some pumps are powered by AC electricity, they are AC Solenoid Pump. While others are powered by DC electricity. these are DC Solenoid Pump. The power source will depend on the specific application.
Application of Solenoid Pump: steam iron, steam mop, coffee machine, floor cleaning machine...
Solenoid Water Pump,Micro Solenoid Water Pump,Dc 24V Solenid Pump,Dc 24V Vibration Solenoid Pump
Shenzhen DYX Technology Co.,Limited , https://www.dyxpump.com